Log in
Who is online?
In total there are 5 users online :: 0 Registered, 0 Hidden and 5 Guests None
Most users ever online was 187 on Wed Apr 07, 2021 3:25 am
Latest topics
Top posting users this week
No user |
What happened to QE2's Stem Anchor.
2 posters
Page 1 of 1
What happened to QE2's Stem Anchor.
QE2 originally had 3 identical anchors in her bow but the number was reduced to 2 in October 1979 and remained that way for the rest of her career.
On QE2's westbound crossing of October 2 - 7 in 1979 she ran into a severe storm. During the storm sea water got into the control mechanism for the stem anchor causing a short circuit which in turn caused the anchor to start lowering itself. By the time its descent was stopped the foot of the anchor was just below the waterline. However, it could not be raised and it was left dangling and banging against the bow until the ship reached New York.
Since the control mechanism was not repairable, the decision was taken to remove the anchor and store it on the foredeck, at least until QE2's end-of-year refit. When I arrived at the pier in New York at 4:30 pm on October 7, workers were in the process of cutting the anchor chain just below the hawser hole and by the time the ship sailed at 7 pm, bound for Southampton, the anchor had been secured to the deck.
As it turned out, the anchor was never re-installed. In her refit later in the year the hawser hole was plated over and the anchor was kept as a spare, secured to the foredeck, for the rest of QE2's career.
On QE2's westbound crossing of October 2 - 7 in 1979 she ran into a severe storm. During the storm sea water got into the control mechanism for the stem anchor causing a short circuit which in turn caused the anchor to start lowering itself. By the time its descent was stopped the foot of the anchor was just below the waterline. However, it could not be raised and it was left dangling and banging against the bow until the ship reached New York.
Since the control mechanism was not repairable, the decision was taken to remove the anchor and store it on the foredeck, at least until QE2's end-of-year refit. When I arrived at the pier in New York at 4:30 pm on October 7, workers were in the process of cutting the anchor chain just below the hawser hole and by the time the ship sailed at 7 pm, bound for Southampton, the anchor had been secured to the deck.
As it turned out, the anchor was never re-installed. In her refit later in the year the hawser hole was plated over and the anchor was kept as a spare, secured to the foredeck, for the rest of QE2's career.
Brian_O- Posts : 233
Join date : 2010-04-20
Location : Montreal, Canada
Re: What happened to QE2's Stem Anchor.
Great story Brian
The anchor was removed from the foredeck,if i recall during the 1996 refit.
As it turned out, the anchor was never re-installed. In her refit later in the year the hawser hole was plated over and the anchor was kept as a spare, secured to the foredeck, for the rest of QE2's career.
The anchor was removed from the foredeck,if i recall during the 1996 refit.
Re: What happened to QE2's Stem Anchor.
Louis De Sousa wrote:Great story Brian
The anchor was removed from the foredeck,if i recall during the 1996 refit.
Thanks for the update, Louis.
Brian_O- Posts : 233
Join date : 2010-04-20
Location : Montreal, Canada
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Wed Nov 27, 2013 7:47 am by Louis De Sousa
» QE2 items now on the new Queen Elizabeth
Tue Nov 26, 2013 12:20 am by lanky lad
» QE2 and the Falklands War
Sat Nov 23, 2013 10:54 pm by Louis De Sousa
» QE2 on You Tube
Sat Nov 23, 2013 9:19 pm by Louis De Sousa
» Hurricane Luis 1995
Sat Nov 23, 2013 7:28 pm by lanky lad